Calculators
Samples
  •  FREE DELIVERY on all orders over £1000*

  •  FREE DELIVERY on all orders over £1000*

0 £0.00

Installing Gate Posts on Solid Foundations

Antique Elite Slatted Composite Gate - Assured Composite

Installing Gate Posts on Solid Foundations

When installing gate posts ensure the area is clear anda free of any obstacles including any cables and pipes.

1. Measure and mark out the area for the gate posts ensuring the spacing between each post is 985mm centre to centre

2. Fix gate post supports to the centre of each mark with the expansion bolts provided. Ensure that the gate post supports are level and are 985mm centre to centre

3. Measure and cut gate posts and the composite plank to 1900mm and push the composite plank into one of the posts

4. Place gate posts over the top of each gate post support ensuring that the gate post with the composite plank is facing the right direction to accommodate the hinges, trims and lock

5. Check all dimensions ensuring that the gate posts are 915mm apart top and bottom

 

Need Some Help? We've Got You Covered!

Explore our frequently asked questions or use our convenient search feature to locate the information you need. Alternatively give our team a call on 01664 400 140 and we'd be happy to help!

© Assured Composite 2025. All Rights Reserved. Assured Composite is a registered company in England and Wales under Company Number: 10166812. VAT Number: 244830019.
Top